HZ.
Design Engineer

Hicham
Zineddine

I design it. I build it. I ship it.

Product Designer and Design Engineer with 5+ years shipping production work for Disney, Warner Bros, Riot Games, Amazon, and Mastercard. I create brand systems, design product interfaces, and write the code to make them real.

Hicham Zineddine Portrait
About

The pitch

I'm a designer who codes and a developer who designs. Based in Morocco, working remotely with teams across the US, MENA, and Europe.

I started in brand identity and creative direction, leading design for Riot Games tournaments across the Arab world and directing Mastercard-sponsored events. Then I started building. I taught myself React, Next.js, and TypeScript and began shipping production code alongside my designs.

Today I do both. I design brand systems, product interfaces, marketing assets, and conversion flows. Then I build them in Figma, Framer, Webflow, Shopify, or straight React. I automate repetitive work with n8n and Make, optimize for SEO, and use AI tools like Claude Code, Cursor, and v0 to move at startup speed.

I don't hand off wireframes and wait. I ship.

Hicham Zineddine - Design Engineer
Services

What I do

Product Design

End-to-end UX and UI. From user research and flows to high-fidelity Figma screens that ship to production without surprises.

Brand Identity & Systems

Logos, typography systems, color palettes, and visual guidelines that scale across every touchpoint without losing coherence.

Design Engineering

I don’t just design it, I build it. React, Next.js, TypeScript, Tailwind, Shopify, Framer, Webflow. Production code, not prototypes.

Growth & Marketing Design

Landing pages, email campaigns, social assets, ad creatives, and conversion optimization. Design tied directly to revenue.

Toolkit

Tools & skills

Design

FigmaFramerWebflowAdobe Creative SuiteCanvaWordPressAI Image Generation

Engineering

ReactNext.jsTypeScriptTailwind CSSshadcn/uiHTML/CSSShopifyPythonNode.js

Automation & Growth

n8nMake (Integromat)SEOStripeAPI IntegrationWorkflow Automation

AI Tooling

Claude CodeCursorv0GitHub CopilotLLM Integration

Languages

Arabic (Native)French (Bilingual)English (Professional)

$K+

direct profit generated from designs I built and shipped

%

conversion rate increase on Disney/Warner Bros product pages

+

concurrent viewers on broadcasts I designed for Riot Games MENA

in-person attendees at events I art directed

+

countries reached through brand work at GGTech and Montrichard

hrs/week

saved through AI automation tools I built

Contact

Let's work together.

I'm currently open to full-time remote roles in product design, design engineering, and creative direction. If you're building something that needs to look great AND actually ship, I'd like to hear about it.

hello@hichamz.com